This was Shoreside's first major project on the mass production of our
Signature Floats. We manufactured approximately 30,000 square feet of our Signature monolithic concrete
floats, with a total of eighty-six modules. The project ran from September 2002 to April 2003 and was
completed ahead of schedule. |